Bohnsack Way Drainage Project Details- During semiannual road inspections, signs of water erosion was noted along the south side of Bohnsack Way. It was determined to make the repairs by reshaping to ditch contour and installing large stones (rip-rap) to allow the water to drain better so that it wouldn't wash over the road. The work took place between a driveway and a field approach.
= Official Event
= Community Event
Subscribe to our Google Calendar For The Latest Meeting Dates and Official Events